For pipe fabrication
AI bid generation built for pipe fabrication.
Drop your isos, specs, and scope docs. BidAnvil extracts quantities, applies your rates, and generates a bid in your house template — cross-checked against every ASME and API requirement.
The pipe fab reality
Bidding in this trade is different.
01
Isos by hand.
Estimators counting fittings on iso PDFs while RFQs stack up on the corner of the desk.
02
Turnarounds don’t wait.
Turnaround bid deadlines don’t care how busy your shop is. Miss the window, miss the job.
03
One estimator, no backup.
One senior knows your rates, your markups, and your client preferences. Take him out and nothing ships.
How it works on pipe fab bids
From iso PDF to finished bid in three steps.
Upload
Iso PDFs, scope docs, spec sheets, BOMs.
Drop them in. BidAnvil classifies and parses automatically.
Review
Line items with your rates applied.
Pipe sizes, fittings, materials, weld callouts — in a table with live inch-dia totals.
Download
Your house template, compliance-checked.
ASME B31.3, API 570, Section IX cross-checked automatically. Output as .docx.
What BidAnvil understands
Configured for your shop. Not a generic tool.
Isometric drawing interpretation
Pipe routing, fitting identification, weld callouts pulled off your isos — not re-typed by hand.
Material-aware rate resolution
Carbon steel, CrMo, stainless, Inconel, LTCS — each routed to the correct line on your rate card.
Process-specific labor
SMAW, GTAW, GMAW, FCAW, SAW — different rates, different productivity factors, applied automatically.
NDE coverage costing
RT, UT, MT, LPI with percentage-based cost modeling pulled straight from your spec callouts.
PWHT requirements
Post-weld heat treatment identified from materials and thickness ranges, priced into the draft.
Shop fab vs field service
Separate labor, handling, and overhead logic for spool fab in the shop vs field work on site.
Bid type awareness
Turnarounds, new construction, and maintenance bids structured differently — BidAnvil knows the difference.
ASME U / S / R + NBIC compliance
Stamp-aware output. Bid language aligns to your stamp authority and code coverage.
ROI for a typical pipe fab shop
8–15 bids a month at 10–15 hours each.
BidAnvil cuts review and assembly time by 40–60%, freeing your estimator to chase the jobs you’re currently no-bidding.
Run your shop’s numbers →40–60%
Prep time cut
4–9 hrs
Saved per bid
2–3 wks
Setup timeline
$1.5–2.5K
Monthly (unlimited bids)
Bring one bid. We’ll run it on the call.
Fifteen minutes. Your last iso drawing package. You’ll see what BidAnvil does on your actual work before you decide anything.
BidAnvil also serves roofing contractors and general contractors. Back to bidanvil.com →
